Sleeper movement prevention fittings for bridge sleepers and switch sleepers.
The pillow block movement prevention device contributes to the safe operation of trains with its excellent structure and characteristics!
The "rail sleeper movement prevention device" is installed on 4 to 8 sleepers before and after the rail joint, while the "switch device sleeper movement prevention device" is applied to the sleepers around the switch. This setup absorbs vibrations, shocks, and accelerations during train operation, preventing the movement of the sleepers. It can be installed and connected regardless of the type of sleeper or irregular spacing between sleepers. Made of rust-resistant and durable cast iron (FCD 450), it contributes to the stable operation of trains over the long term. For more details, please contact us or refer to the catalog.
- Company:林総事
- Price:Other